Project delivery navigator

Every phase, every gate, nothing missed.

Pick your project type. Project Navigator builds the lifecycle that fits it: ordered steps, entry and exit criteria, the artifacts each phase must produce, and prompts when an action goes overdue.

Subscription · $14.99/month · 14-day free trial
1

Choose your project type

The type sets the phase names, the ordered steps, the gates you must pass and the artifacts you must produce. You can switch type on the lifecycle at any time before you start.

Technology & Software: For product builds, platform migrations, integrations and internal systems where scope lives in a backlog and release quality decides the outcome.

2

Your lifecycle

This is exactly what your workspace will guide you through, generated from the type you selected.

Lifecycle

Technology & Software

5 phases · 33 steps

1

Discovery & Initiation

6 steps

Agree the outcome, the product owner and the success measures before design or build spend begins.

  • ·Write the problem and outcome statement
  • ·Name the sponsor and product owner
  • ·Set the product vision and success metrics
  • +3 more
Problem statementProject charterStakeholder map
2

Design & Plan

7 steps

Turn the agreed outcome into a baselined backlog, an approved design and a release plan you can defend.

  • ·Baseline requirements and the initial backlog
  • ·Complete solution and technical design
  • ·Plan releases, environments and the delivery cadence
  • +4 more
Requirements baselineTechnical designRelease plan
3

Build & Integrate

7 steps

Build through controlled increments, with changes, defects and vendor delivery managed as they arise.

  • ·Mobilise the squad and agree ways of working
  • ·Run refinement and the delivery cadence
  • ·Build, review and integrate
  • +4 more
Accepted incrementsBuild and integration recordChange log
4

Test & Release

6 steps

Prove the release meets acceptance criteria, control performance against the baselines, and land it safely.

  • ·Run system, regression and non-functional testing
  • ·Run UAT and obtain acceptance
  • ·Measure performance against baseline
  • +3 more
Test resultsUAT sign-offVariance report
5

Hypercare & Close

7 steps

Stabilise the release, transfer ownership to support, and capture what the next build should not relearn.

  • ·Run hypercare and stabilise
  • ·Hand over to support and document the runbook
  • ·Reconcile final costs and close contracts
  • +4 more
Hypercare logHandover certificateFinal cost report

Gated checklists

Each phase has entry criteria, ordered steps and an exit gate, so you always know what must be true before moving on.

Artifact templates

Every deliverable links to a working template you can download and fill in, from charter to closure report.

Overdue prompts

A daily scheduler flags actions that slip past their due date and emails you a summary, so nothing quietly stalls.

Subscription only

One plan. Every project type.

$14.99 a month or $149 a year (two months free) gives you unlimited projects, all four lifecycles, the full artifact library and the overdue scheduler. Every new account starts with a 14-day free trial, and you can cancel any time.

Sign in to subscribe